More Pre-Feasibility Study (PFS) work has kept us busy of late, this time for a client with a world class deposit that stretches out over a very long strike. With the optimisation work producing lots of Whittle shells, there’s a stack of preliminary design and scheduling work to complete before Christmas, but our Auralia engineers are enjoying the challenge of completing the mining technical work on this exciting project!

news
Anson hits 1Mt at Paradox
Congratulations to our friends at Anson Resources on hitting the 1 million tonne mark of Lithium Carbonate Equivalent (LCE) at their Paradox #Lithium Project. It’s